Construction Update: from the Board of Education meeting of December 11, 2008
Construction Update report from Al Steffeter, representing Henry Bros. Construction. Lincoln-Way West project continues on a safely quality manner, on schedule and under budget. The asphalt paving and roadway stripping has been completed on both Spencer and Gougar Roads. Com-Ed has completed the removal of all abandoned electrical power poles along Spencer and Gougar Roads. Installation of the highway traffic guardrails continues along Spencer Road. The bid package #1 site work has now been completed including the installation of the stadium synthetic turf. Drywall installation and taping continues on steadily in all three buildings. Scaffolding has been erected in the Auditorium seating area from which the overhead floating drywall ceiling clouds will be suspended. Locker installations continue on in the AC Building.
Construction Update: from the Board of Education meeting of November 14, 2008
Construction Update report from Al Steffeter, representing Henry Bros. Construction. Lincoln-Way West project continues on a safely, quality manner, on schedule and under budget. The Fine Art and Academic building roofs are 100% completed. The Physical Education roof is now 99% completed. Installation of the metal roof parapet wall copings continues on all three buildings. Installation of the ductwork, fire protection, piping, plumbing, electrical systems, fire alarm systems, temperature control systems and communications systems continues on in all buildings at a steady pace. Installation of the stadium synthetic playing turf is now 75% complete. AT &T is currently installing telephone cabling and equipment into the schools communications equipment room.
|
|